Final | 12/4/2007 | 12/5/2007 | 12/5/2007 | P | PASS |
Jim Johnson
|
|
|
PLEASE USE DOUG AS CONTACT. THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY
|
Final | 12/3/2007 | 12/4/2007 | 12/4/2007 | A | FAIL |
Jim Johnson
|
|
|
premise protection not approve for vertical installation need to repipe need to increase water service entering building to 11/2 and provide 11/2 pressure reducing valve and 11/2 backflow device for premise protection as noted from starbuck,s engineer letter posted on front door need RP installed on dishwasher need RP installed on water supply line to RO system as per water purveryor requirement,s left correction notice on site
|
Final | 12/3/2007 | 12/3/2007 | 12/3/2007 | P | CANC |
Jim Johnson
|
|
|
PLEASE USE DOUG AS THE CONTACT. THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY canc by Mike Webb
|
Final | 11/30/2007 | 11/30/2007 | 11/30/2007 | P | CANC |
Jim Johnson
|
|
|
PLEASE SCHEDULE FOR A LATE AFTERNOON INSPECTION. JOB CONTACT IS DOUG FRIEDMAN. Phone #: ###-#### Internet Inspection Request from: ADAM WARR Inspection cancelled from web by: JENN STALEY
|
Plumbing Rough-in | 11/5/2007 | 11/6/2007 | 11/6/2007 | A | PASS |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 11/5/2007 | 11/5/2007 | 11/5/2007 | P | NR |
Jim Johnson
|
|
|
PLEASE USE DOUG AS CONTACT. THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY not ready
|
Groundwork | 10/25/2007 | 10/25/2007 | 10/25/2007 | P | PASS |
Jim Johnson
|
|
|
PLEASE USE DOUG AS CONTACT. THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY
|
Groundwork | 10/23/2007 | 10/24/2007 | 10/24/2007 | A | PASS |
Jim Johnson
|
|
|
JOB CONTACT IS DOUG ####-#### Phone #: ###-#### Internet Inspection Request from: MARGGIE BUSS DWV for ground work only test ok NOTE called contractor to confirm with engineer if one inch water service installed on shell permit is adequate for water distribution T.I. MAY NEED TO INCERASE WATER SERVICE SIZE
|