Final | 2/11/2008 | 2/12/2008 | 2/12/2008 | A | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 2/11/2008 at 6:16:08 PM. Contact: ###-####.
|
Plumbing Rough-in | 10/28/2007 | 10/29/2007 | 10/29/2007 | A | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 10/28/2007 at 7:44:51 PM. Contact: ###-####.
|
Plumbing Rough-in | 10/25/2007 | 10/25/2007 | 10/25/2007 | A | FAIL |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 10/25/2007 at 7:22:56 AM. Contact: ###-####.need to fix reverse grade on downstairs tub trap arm.
|