Final | 3/7/2008 | 3/10/2008 | 3/10/2008 | A | PASS |
Daryl Spivey
|
|
|
Call Jon for access. All corrections made from previous final plumbing insp. Phone #: ###-#### Internet Inspection Request from: Jeff Coate
|
Final | 2/29/2008 | 2/29/2008 | 2/29/2008 | P | NR |
Daryl Spivey
|
|
|
call for access Phone #: ###-#### Internet Inspection Request from: Jeff Coate need all equip. installed, temp control on lavs, mop sk caulked, and T&P installed per code........ds
|
Plumbing Rough-in | 1/3/2008 | 1/3/2008 | 1/3/2008 | P | PASS |
Daryl Spivey
|
|
|
john- please call for access Phone #: ###-####
|
Plumbing Rough-in | 12/28/2007 | 12/28/2007 | 12/28/2007 | P | NH |
Daryl Spivey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jeff Coate no one there and no access. called plumber with no reply...........ds
|
Groundwork | 11/8/2007 | 11/8/2007 | 11/8/2007 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jeff Coate
|