Final | 1/7/2008 | 1/7/2008 | 1/7/2008 | P | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 1/7/2008 at 9:51:22 AM. Contact: ###-####.
|
Plumbing Rough-in | 12/3/2007 | 12/3/2007 | 12/3/2007 | P | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 12/3/2007 at 8:03:48 AM. Contact: ###-####.
|
Groundwork | 11/19/2007 | 11/19/2007 | 11/19/2007 | P | PASS |
Daryl Spivey
|
|
|
rob Phone #: ###-####
|
Groundwork | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | FAIL |
Daryl Spivey
|
|
|
rob Phone #: ###-#### needs backwater valve installed......ds
|