Final | 4/11/2008 | 4/14/2008 | 4/14/2008 | A | PASS |
Eric Strole
|
|
|
|
Final | 4/10/2008 | 4/11/2008 | 4/11/2008 | P | NR |
Eric Strole
|
|
|
|
Plumbing Rough-in | 4/10/2008 | 4/10/2008 | 4/10/2008 | P | NR |
Eric Strole
|
|
|
Hey Eric, This is the house that we spoke about the other day that has the veggie sink on backorder and the master soaker that needs to be repaired by Kohler. I should have everthing buttoned up and caulked in by noon. Thanks, Josh Phone #: ###-#### Internet Inspection Request from: Josh Roper
|
Plumbing Rough-in | 11/28/2007 | 11/28/2007 | 11/28/2007 | P | PASS |
Eric Strole
|
|
|
Back-graded drain line and nailplates fixed. Phone #: ###-#### Internet Inspection Request from: Stephanie Roper
|
Plumbing Rough-in | 11/26/2007 | 11/26/2007 | 11/26/2007 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: Stephanie Roper-fix reverse grade on 2" horizontal drain serving flr drain in mech room, ok to pull test.
|