Final | 3/6/2008 | 3/6/2008 | 3/6/2008 | P | PASS |
Jim Johnson
|
|
|
If questions call Scott @ ###-####. Phone #: ###-#### x0000 Internet Inspection Request from: Sonja Hankel
|
Final | 2/28/2008 | 2/29/2008 | 2/29/2008 | A | PART |
Jim Johnson
|
|
|
If questions call Scott @ ###-####. Phone #: ###-#### x0000 Internet Inspection Request from: Sonja Hankel need to provide signage identification of potable and nonpotable water system contractor to recall when ready
|
Plumbing Rough-in | 1/23/2008 | 1/24/2008 | 1/24/2008 | A | PASS |
Eric Strole
|
|
|
If questions call Todd @ ###-####. Phone #: ###-#### x0000 Internet Inspection Request from: Sonja Hankel
|
Water and/or Sewer | 1/14/2008 | 1/14/2008 | 1/15/2008 | P | PASS |
Jim Johnson
|
|
|
Outside sewer line inspection. If questions call Blair @ ###-####. Phone #: ###-#### x0000 Internet Inspection Request from: Sonja Hankel
|
Groundwork | 1/3/2008 | 1/4/2008 | 1/4/2008 | P | PASS |
Jim Johnson
|
|
|
If questions call Dave @ ###-####. Phone #: ###-#### x0000 Internet Inspection Request from: Sonja Hankel
|