Final | 6/4/2008 | 6/5/2008 | 6/5/2008 | A | PASS |
Daryl Spivey
|
|
|
Internet Inspection Request from: Ina Schneider
|
Water and/or Sewer | 5/6/2008 | 5/8/2008 | 5/8/2008 | A | PASS |
Daryl Spivey
|
|
|
dillion Phone #: ###-####
|
Final | 5/5/2008 | 5/6/2008 | 5/6/2008 | A | FAIL |
Bill VanDegrift
|
|
|
CALL DEREK COOPER FOR ACCESS ###-#### Internet Inspection Request from: Ina Schneider remove rp and replace with dcva or provide drainage to accept full discharge. no permit for the sewer and water services or the sprinler.
|
Plumbing Rough-in | 3/6/2008 | 3/6/2008 | 3/6/2008 | P | CANC |
Daryl Spivey
|
|
|
derick Phone #: ###-#### roof drain piping to site drainage tank.......ds
|
Roof Drains | 3/6/2008 | 3/6/2008 | 3/6/2008 | P | PASS |
Daryl Spivey
|
|
|
derick Phone #: ###-####
|
Roof Drains | 2/28/2008 | 2/28/2008 | 2/28/2008 | P | PART |
Daryl Spivey
|
|
|
darik Phone #: ###-#### east side tested ok.........ds
|
Plumbing Rough-in | 2/27/2008 | 2/28/2008 | 2/28/2008 | A | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 2/27/2008 at 1:30:48 PM. Contact: ###-####.
|
Plumbing Rough-in | 1/4/2008 | 1/7/2008 | 1/7/2008 | P | CANC |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 1/4/2008 at 2:51:33 PM. Contact: ###-####.
|
Groundwork | 1/7/2008 | 1/7/2008 | 1/7/2008 | P | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 1/4/2008 at 2:51:33 PM. Contact: ###-####.
|