Final | 9/8/2008 | 9/9/2008 | 9/9/2008 | P | PASS |
Bill VanDegrift
|
|
|
Finally we get to call for a final on this project. Should be ready any time after 1:00 P.M. Phone #: ###-#### Internet Inspection Request from: Randy Calkins final ok with floor drains by the water heaters exposed.
|
PLM-Aging Inspection | 8/4/2008 | 8/4/2008 | 8/4/2008 | | PASS |
Bill VanDegrift
|
|
|
still working
|
PLM-Aging Inspection | 5/27/2008 | 6/2/2008 | 6/2/2008 | A | PASS |
Bill VanDegrift
|
|
|
|
PLM-Aging Inspection | 5/27/2008 | 5/27/2008 | 5/27/2008 | | CANC |
Lee Rice
|
|
|
|
Plumbing Rough-in | 3/22/2008 | 3/24/2008 | 3/24/2008 | A | PASS |
Daryl Spivey
|
|
|
reinspection of 1st half and inspection of 2nd half. Would like the inspection 1st thing if possible Thank You Phone #: ###-#### Internet Inspection Request from: Randy Calkins
|
Plumbing Rough-in | 3/19/2008 | 3/20/2008 | 3/20/2008 | A | FAIL |
Daryl Spivey
|
|
|
This is for 1/2 of duplex. Phone #: ###-#### Internet Inspection Request from: Randy Calkins move water lines out of cold space upstairs and test waste and vent from basement fixtures..........ds
|
PLM-Aging Inspection | 3/10/2008 | 3/10/2008 | 3/10/2008 | | PASS |
Bill VanDegrift
|
|
|
wip
|
Groundwork | 1/7/2008 | 1/8/2008 | 1/8/2008 | P | PASS |
Gerry Varner
|
|
|
Billy; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|