DOC - Permit Finaled | | | 10/3/2008 | | DONE |
|
|
|
finaled by 330 on 8/15/08
|
Final | 8/15/2008 | 8/15/2008 | 8/15/2008 | P | PASS |
Bill VanDegrift
|
|
|
this is for the shell and t.i. they are both on the same plan.
|
Plumbing Rough-in | 6/18/2008 | 6/19/2008 | 6/19/2008 | P | PASS |
Bill VanDegrift
|
|
|
Pleasee call Bill Satterfield at phone # given Phone #: ###-#### Internet Inspection Request from: Diane Houst this is for the addition of a shower and the inspection is for the waste in the 1st floor ceiling.
|
Plumbing Rough-in | 5/7/2008 | 5/7/2008 | 5/7/2008 | A | PASS |
Bill VanDegrift
|
|
|
1st floor ri only ok to cover.
|
Plumbing Rough-in | 5/2/2008 | 5/5/2008 | 5/5/2008 | P | FAIL |
Bill VanDegrift
|
|
|
Call Darren please Phone #: ###-#### Internet Inspection Request from: joe paige provide approved plans. remove rp on the service and replace with a dcva or provide drainage to accept full discharge. tent water lines in the attic. tests ok.
|
PLM-Aging Inspection | 3/20/2008 | 3/20/2008 | 3/20/2008 | | PASS |
Bill VanDegrift
|
|
|
|
Groundwork | 1/8/2008 | 1/8/2008 | 1/8/2008 | A | PASS |
Daryl Spivey
|
|
|
Tested along with sewer and water inspection......ds
|
Water and/or Sewer | 1/8/2008 | 1/8/2008 | 1/8/2008 | P | PASS |
Daryl Spivey
|
|
|
Call Darren please Phone #: ###-#### Internet Inspection Request from: joe paige
|