Final | 9/18/2008 | 9/18/2008 | 9/18/2008 | P | PASS |
Jim Johnson
|
|
|
|
Final | 9/15/2008 | 9/16/2008 | 9/16/2008 | A | FAIL |
Jim Johnson
|
|
|
contact is Chris Buss Phone #: ###-#### Internet Inspection Request from: LENNIE BUSS need to have new lawn sprinkler connection and backflow device permitted, inspected, tested and certified prior to final plumbing inspection on new building note need to have final sign-off card on site for sign-off left correction notice on site
|
Final | 9/11/2008 | 9/12/2008 | 9/12/2008 | A | PART |
Jim Johnson
|
|
|
Contact Chris Buss Phone #: ###-#### Internet Inspection Request from: James Stanford need to secure T&P over floor drain need to provide strainer and grate for floor sink need to cut outside cleanout,s down to grade and cap with an approved cap need to have sign-off card on site called contractor will recall when ready
|
PLM-Aging Inspection | 8/11/2008 | 8/11/2008 | 8/11/2008 | | PASS |
Jim Johnson
|
|
|
under construction
|
Plumbing Rough-in | 6/9/2008 | 6/10/2008 | 6/10/2008 | A | PASS |
Jim Johnson
|
|
|
PLEASE USE SHAWN AS CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY
|
Plumbing Rough-in | 5/30/2008 | 6/2/2008 | 6/2/2008 | P | PART |
Jim Johnson
|
|
|
PLEASE USE SHAWN FOR CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY need to have tenting over all overhead water prior to rough-in inspection contractor to recall when ready
|
Plumbing Rough-in | 5/16/2008 | 5/19/2008 | 5/19/2008 | A | PART |
Jim Johnson
|
|
|
PLEASE USE SHAWN AS CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY need to have all over head water tented prior to rough-in inspection need to repipe front hydrant and retest water D W V test ok called contact plumber will recall when ready
|
Other | 4/2/2008 | 4/2/2008 | 4/2/2008 | P | PART |
Jim Johnson
|
|
|
ground work on new addition replumbed to make grade on existing sewer line test ok . sewer line from new addition and grease interceptor to point of connection correction made on bedding of pipe and adjusting grade ok. done by Buss mechanical apex excavation repiped existing sewer line from cloverdale 94 feet up to point of connection to new sewer line from addition with out inspection . BEN ( Petra job foreman) in our conversation over phone did not want apex excavation back on job had buss mechanical pot hole sewer line in three location,s to check material and grade and test sewer line. test ok
|
Other | 3/31/2008 | 3/31/2008 | 3/31/2008 | P | PART |
Jim Johnson
|
|
|
THIS IS AN UNDERGROUND INSPECTION, PLEASE USE SHAWN AS CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY water test on new sewer line from new building and grease interceptor to existing sewer location test ok need to bed sewer line with approved material and adjust grade on sewer line and have reinspected may still have grade problem out to existing sewer location
|
Groundwork | 3/25/2008 | 3/26/2008 | 3/26/2008 | A | NR |
Eric Strole
|
|
|
THIS IS AN UNDERGROUND INSPECTION AND SHAWN WILL BE THE CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY
|
Groundwork | 3/21/2008 | 3/24/2008 | 3/24/2008 | P | CANC |
Jim Johnson
|
|
|
JOB CONTACT IS SHAWN Phone #: ###-#### Internet Inspection Request from: ADAM WARR Inspection cancelled from web by: James Stanford
|
Water and/or Sewer | 2/15/2008 | 2/19/2008 | 2/19/2008 | A | PART |
Jim Johnson
|
|
|
test on interceptor interceptor test ok
|
Groundwork | 2/15/2008 | 2/15/2008 | 2/15/2008 | P | PART |
Eric Strole
|
|
|
JOB CONTACT IS CHRIS BUSS Phone #: ###-#### Internet Inspection Request from: ADAM WARR-start 24 hr test on interceptor, piping upstream & downstream of interceptor pass.
|
Groundwork | 2/12/2008 | 2/13/2008 | 2/13/2008 | P | PASS |
Jim Johnson
|
|
|
Job contact is Chris Buss Phone #: ###-#### Internet Inspection Request from: ADAM WARR
|