Final | 8/3/2009 | 8/3/2009 | 8/3/2009 | P | PASS |
Daryl Spivey
|
|
|
building supply backflow protection is tested and certified.................ds
|
Other | 8/3/2009 | 8/3/2009 | 8/3/2009 | P | CANC |
Daryl Spivey
|
|
|
patty Phone #: ###-####
|
Final | 7/8/2009 | 7/9/2009 | 7/9/2009 | P | PEND |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 7/8/2009 at 6:45:25 AM. Contact: ###-####. both main water service dcva's failed test......all other b/f's tested ok.........ds
|
Final | 7/7/2009 | 7/7/2009 | 7/7/2009 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 7/7/2009 at 8:55:38 AM. Contact: ###-####. need all back flows tested and certified.....ds
|
PLM-Aging Inspection | 6/9/2009 | 6/9/2009 | 6/10/2009 | | NR |
Daryl Spivey
|
|
|
wip
|
Final | 4/9/2009 | 4/9/2009 | 4/9/2009 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 4/9/2009 at 8:10:01 AM. Contact: ###-####. area C final................ds
|
Final | 3/31/2009 | 3/31/2009 | 3/31/2009 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 3/31/2009 at 7:04:03 AM. Contact: ###-####. walked thru D, E, F, G, and H. Everything except backflows ok........All backflows will be tested by final walk thru......ds
|
Plumbing Rough-in | 3/3/2009 | 3/4/2009 | 3/4/2009 | A | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 3/3/2009 at 3:25:03 PM. main water lines.........ds
|
Final | 1/13/2009 | 1/14/2009 | 1/14/2009 | A | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 1/13/2009 at 12:57:52 PM. Contact: ###-####. Main bathrooms areas D,E,G and H ok...ds
|
Plumbing Rough-in | 12/12/2008 | 12/12/2008 | 12/12/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 12/12/2008 at 11:27:15 AM. Contact: ###-####.Roof drains and water in area B all roughed in..........ds
|
Plumbing Rough-in | 12/3/2008 | 12/4/2008 | 12/4/2008 | A | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 12/3/2008 at 3:24:39 PM. Contact: ###-####.area-c water pass.
|
Plumbing Rough-in | 11/24/2008 | 11/25/2008 | 11/25/2008 | A | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 11/24/2008 at 10:07:31 AM. Contact: ###-####. water in kitchen area.....ds
|
Plumbing Rough-in | 11/12/2008 | 11/12/2008 | 11/12/2008 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 11/12/2008 at 9:57:52 AM. Contact: ###-####.water & dwv test in library pass, need to use an approved tap tee on sink.
|
Roof Drains | 11/6/2008 | 11/7/2008 | 11/7/2008 | A | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 11/6/2008 at 3:04:18 PM. Contact: ###-####. tested ok...... areas A&B...........ds
|
Roof Drains | 11/3/2008 | 11/4/2008 | 11/4/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 11/3/2008 at 1:28:22 PM. Contact: ###-####. roof drains west side of gym tested ok.......ds
|
Roof Drains | 11/4/2008 | 11/4/2008 | 11/4/2008 | A | PART |
Daryl Spivey
|
|
|
Mark gym area.east side tested ok.............ds
|
Roof Drains | 10/24/2008 | 10/27/2008 | 10/27/2008 | A | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 10/24/2008 at 2:32:57 PM. Contact: ###-####. roof drains in area C tested ok.....ds
|
Roof Drains | 10/22/2008 | 10/23/2008 | 10/23/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 10/22/2008 at 11:50:17 AM. Contact: ###-####. area B in band and orchestra rooms........ds
|
Roof Drains | 10/15/2008 | 10/16/2008 | 10/16/2008 | A | CANC |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 10/15/2008 at 11:31:52 AM. Contact: ###-####. area B roof drains above kitchen tested ok.....ds
|
Plumbing Rough-in | 10/13/2008 | 10/13/2008 | 10/13/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 10/13/2008 at 8:59:01 AM. Contact: ###-####.area g complete...roof drains tested in area F..........ds
|
Plumbing Rough-in | 10/8/2008 | 10/8/2008 | 10/8/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 10/8/2008 at 8:12:03 AM. Contact: ###-####. area G waters..........ds
|
Roof Drains | 10/7/2008 | 10/7/2008 | 10/7/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 10/7/2008 at 7:49:41 AM. Contact: ###-####. R/D's done in area G...........ds
|
Plumbing Rough-in | 9/18/2008 | 9/19/2008 | 9/19/2008 | A | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 9/18/2008 at 8:13:31 AM. Contact: ###-####. area h roughed in and teachers lounge in G.......ds
|
Plumbing Rough-in | 9/8/2008 | 9/9/2008 | 9/9/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 9/8/2008 at 11:58:07 AM. Contact: ###-####. area H roof drains tested ok.....ds
|
Plumbing Rough-in | 8/26/2008 | 8/27/2008 | 8/27/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 8/26/2008 at 11:47:33 AM. Contact: ###-####. areas D and E r/i complete and waste up to G & H restrooms tested...........ds
|
Plumbing Rough-in | 8/25/2008 | 8/26/2008 | 8/26/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 8/25/2008 at 11:49:02 AM. Contact: ###-####. waste, vent and water areas D and E.....some roof drains also..........ds
|
Plumbing Rough-in | 8/25/2008 | 8/25/2008 | 8/25/2008 | P | DONE |
Daryl Spivey
|
|
|
water tested in area D..........ds
|
Plumbing Rough-in | 8/25/2008 | 8/26/2008 | 8/25/2008 | A | CANC |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 8/25/2008 at 10:00:26 AM. Contact: ###-####.
|
PLM-Aging Inspection | 7/21/2008 | 7/21/2008 | 7/21/2008 | | NR |
Daryl Spivey
|
|
|
wip
|
PLM-Aging Inspection | 5/21/2008 | 5/21/2008 | 5/21/2008 | | NR |
Daryl Spivey
|
|
|
wip
|
Groundwork | 3/20/2008 | 3/21/2008 | 3/21/2008 | A | PART |
Daryl Spivey
|
|
|
rescheduled..NR......ds branch lines in area A.........tested ok..ds
|
Groundwork | 3/20/2008 | 3/20/2008 | 3/20/2008 | P | CANC |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 3/20/2008 at 6:20:56 AM. Contact: ###-####.
|
Groundwork | 3/19/2008 | 3/19/2008 | 3/19/2008 | P | CANC |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 3/19/2008 at 6:12:11 AM. Contact: ###-####.
|
Groundwork | 3/14/2008 | 3/17/2008 | 3/17/2008 | A | PART |
Daryl Spivey
|
|
|
9 am Main line area A gym locker area.........ds
|
Groundwork | 3/14/2008 | 3/14/2008 | 3/14/2008 | P | NR |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 3/14/2008 at 5:42:53 AM. Contact: ###-####.
|
Groundwork | 3/11/2008 | 3/12/2008 | 3/12/2008 | A | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 3/11/2008 at 3:13:48 PM. Contact: ###-####.-grease waste & piping upstream & downstream of interceptor pass, interceptor still needs tested.
|
Groundwork | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 3/7/2008 at 8:21:56 AM. Contact: ###-####. branch lines off of main san. waste line by kitchen area and water service line tested ok.........ds
|
Groundwork | 3/5/2008 | 3/6/2008 | 3/6/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 3/5/2008 at 1:44:05 PM. Contact: ###-####. Bathroom grp and san waste at kitchen area tested ok..........ds
|
Groundwork | 2/29/2008 | 3/3/2008 | 3/3/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 2/29/2008 at 3:42:39 PM. Contact: ###-####.area B branch drains with bathrm grp....ds
|
Groundwork | 2/28/2008 | 2/29/2008 | 2/29/2008 | A | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 2/28/2008 at 2:58:21 PM. Contact: ###-####. main tested area B.....ds
|
Groundwork | 2/22/2008 | 2/25/2008 | 2/25/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 2/22/2008 at 3:37:54 PM. Contact: ###-####. G/W done in D & E areas..............ds
|
Groundwork | 2/20/2008 | 2/21/2008 | 2/21/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 2/20/2008 at 11:51:02 AM. Contact: ###-####. branch lines sec...D tested and 6" roof drain as marked on print.......ds
|
Groundwork | 2/18/2008 | 2/19/2008 | 2/19/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 2/18/2008 at 1:24:46 PM. Contact: ###-####. sec. D and E waste, vent and acid waste area partial as marked on print...........ds
|
Groundwork | 2/12/2008 | 2/13/2008 | 2/13/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 2/12/2008 at 3:04:29 PM. Contact: ###-####. main building drain for areas D & E....marked on print...ds
|