Final | 11/10/2008 | 11/10/2008 | 11/10/2008 | P | PASS |
Jim Johnson
|
|
|
Sean Hartshaffer is the field contact. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
PLM-Aging Inspection | 10/10/2008 | 10/10/2008 | 10/10/2008 | | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 8/7/2008 | 8/8/2008 | 8/8/2008 | A | PART |
Jim Johnson
|
|
|
venting in pump room area and five vent,s in data area test ok ok to cover
|
Water and/or Sewer | 8/6/2008 | 8/7/2008 | 8/7/2008 | A | NR |
Jim Johnson
|
|
|
Waste and Vent inspection requested. Scott Clingan is the field contact. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet not ready
|
Plumbing Rough-in | 7/29/2008 | 7/30/2008 | 7/30/2008 | P | CANC |
Jim Johnson
|
|
|
Brent Proper is the field contact. He needs a partial rough in on Level 3. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet Inspection cancelled from web by: Heidi Mallet
|
PLM-Aging Inspection | 5/30/2008 | 5/30/2008 | 5/30/2008 | | PASS |
Jim Johnson
|
|
|
project under construction
|
Groundwork | 3/26/2008 | 3/27/2008 | 3/27/2008 | A | PASS |
Jim Johnson
|
|
|
|
Groundwork | 3/26/2008 | 3/26/2008 | 3/26/2008 | P | PART |
Eric Strole
|
|
|
jim also the plans show main sewer line where the saddle valve is to be 8", it is a 6" line?
|
Groundwork | 3/25/2008 | 3/26/2008 | 3/26/2008 | P | PART |
Eric Strole
|
|
|
Scott Clingan is the field contact. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet-good portion of ground work was backfilled before inspection, sections of groundwork that could be seen pass, need to use approved saddle on sewer tie in. jim, i did see all y's off trunk line except 2. most branches off trunk line are covered. ok to cover sections that i have seen.
|