Final | 6/30/2008 | 6/30/2008 | 6/30/2008 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: Leanne Ruzicka
|
Plumbing Rough-in | 4/28/2008 | 4/28/2008 | 4/28/2008 | P | PASS |
Eric Strole
|
|
|
Internet Inspection Request from: Leanne Ruzicka
|
Plumbing Rough-in | 4/24/2008 | 4/25/2008 | 4/25/2008 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: Leanne Ruzicka-dwv test failed.
|
Water and/or Sewer | 4/3/2008 | 4/4/2008 | 4/4/2008 | A | PEND |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: Leanne Ruzicka-platinum plumbing did not do water & sewer, left correction notice that there will be no water & sewer inspection till permit is issued & water & sewer is on test.
|
Groundwork | 3/18/2008 | 3/19/2008 | 3/19/2008 | P | PASS |
Bill VanDegrift
|
|
|
please call Cameron with any questions or concerns at ###-####. Thanks!! Phone #: ###-#### Internet Inspection Request from: Leanne Ruzicka gw ok just needs water rolled under footing.
|