Final | 6/3/2008 | 6/3/2008 | 6/3/2008 | A | PASS |
Bill VanDegrift
|
|
|
final ok
|
Final | 6/2/2008 | 6/2/2008 | 6/2/2008 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 6/2/2008 at 8:35:39 AM. Contact: ###-####.final ok, will final permit when sprinkler contractor has permit.
|
Plumbing Rough-in | 3/28/2008 | 3/28/2008 | 3/28/2008 | P | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 3/28/2008 at 9:03:20 AM. Contact: ###-####.
|
Plumbing Rough-in | 3/20/2008 | 3/21/2008 | 3/21/2008 | P | NR |
Bill VanDegrift
|
|
|
reinspection no corrections yet
|
Plumbing Rough-in | 3/20/2008 | 3/20/2008 | 3/20/2008 | P | CANC |
Bill VanDegrift
|
|
|
scott Phone #: ###-#### nail plates needed on the water softener p-trap vent on the 2nd floor.. master tub waste is backgraded at its connection with the lav drain in the 1st floor ceiling.
|