Final | 4/24/2008 | 4/25/2008 | 4/25/2008 | P | PASS |
Eric Strole
|
|
|
|
Final | 4/24/2008 | 4/25/2008 | 4/24/2008 | A | CANC |
Bill VanDegrift
|
|
|
|
Final | 4/24/2008 | 4/24/2008 | 4/24/2008 | P | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 4/24/2008 at 8:08:16 AM. Contact: ###-####. one of the toilets on the perit is a urinal, not ready.
|
Plumbing Rough-in | 3/26/2008 | 3/27/2008 | 3/27/2008 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 3/26/2008 at 3:05:16 PM. Contact: ###-####. R/I for urinal and lav in garage only.....ds
|
Plumbing Rough-in | 3/25/2008 | 3/26/2008 | 3/26/2008 | P | NR |
Daryl Spivey
|
|
|
lee - Note: call for gate code ###-#### urinal and wash basin in garage for r/i Phone #: ###-####
|