Sprinkler (Final) | 5/9/2008 | 5/12/2008 | 5/12/2008 | A | PASS |
Eric Strole
|
|
|
|
Sprinkler (Final) | 5/8/2008 | 5/8/2008 | 5/8/2008 | P | PART |
Jim Johnson
|
|
|
tie in ok ok to cover still need to have double check tested and certified
|
Sprinkler (Final) | 5/7/2008 | 5/7/2008 | 5/7/2008 | P | DONE |
Eric Strole
|
|
|
between 1:30 & 2:30-this was another conferance.
|
Sprinkler (Final) | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | FAIL |
Eric Strole
|
|
|
cannot have pvc pipe in house, need to see can of pvc glue, need drain down valve, dbva needs tested & certified.
|
Sprinkler (Final) | 4/29/2008 | 4/30/2008 | 4/30/2008 | A | DONE |
Eric Strole
|
|
|
this was a conferance on installing sprinkler tie in.
|
Sprinkler (Final) | 4/29/2008 | 4/29/2008 | 4/29/2008 | P | FAIL |
Eric Strole
|
|
|
called kim and set up inspection to go over corrections to be made.
|