Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberPLM08-00673
StatusFinaled
Name IDAHO PUMP & PLUMBING
Site Address 301 N 29TH ST
Project Name301 N 29TH ST
Customer Number 
ePlanReview 
Description
Plumbing Permit - Alteration: plumbing relocatable
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final8/22/20088/22/20088/22/2008APASS
DetailsEric Strole
Final7/10/20087/10/20087/10/2008PFAIL
DetailsEric Strole
dbca's need tested & certified
Final6/30/20086/30/20086/30/2008AFAIL
DetailsDaryl Spivey
need to have dcva's tested and certified...........ds
Final6/26/20086/27/20086/27/2008APART
DetailsEric Strole
The general contractor was wondering if we could change this permit to being tied into the modullar building permits # bld 08-00177 or bld 08-00151. Maybe this will allow us to get a final on our project. The backflows are still not inspected which should be sent in by Boise School Dist. If you have any questions, please call me, Thanks, Bonnie Phone #: ###-#### Internet Inspection Request from: Bonnie Gilbert-will final permit when permit is issued for correction notice that was issued for backflow protection.(idaho pump & plumbing did not do the work)

Final6/23/20086/24/20086/24/2008AFAIL
DetailsDaryl Spivey
I will have a plumber at the site by 8:00 AM Phone #: ###-#### Internet Inspection Request from: Bonnie Gilbert
need backflows tested..ds
PLM-Aging Inspection6/9/20086/9/20086/9/2008 NR
DetailsDaryl Spivey
wip
Plumbing Rough-in4/3/20084/3/20084/3/2008PPART
DetailsDaryl Spivey
water and sewer is ready Phone #: ###-#### Internet Inspection Request from: Bonnie Gilbert
water service ok to backfill and sewer ok........ds
Other4/1/20084/1/20084/1/2008PPART
DetailsEric Strole
this is for a walk thru with bill thompson at 1:30 pm-need a dbca for premis, rpba for make up water for boilers needs tested & certified, dishwasher in kitchen needs a rpba, all eyewashes need pvb's, soap dispensors on mop sinks need replaced with one's with air gap or add rpba's. needs done by final. water line from curb up to manafold ok to cover, still needs tested.
Plumbing Rough-in3/31/20084/1/20084/1/2008APART
DetailsEric Strole
rough in ready Tues. AM Phone #: ###-#### Internet Inspection Request from: Bonnie Gilbert-sewer pass.