Final | 10/10/2008 | 10/13/2008 | 10/13/2008 | A | PASS |
Eric Strole
|
|
|
|
Final | 10/9/2008 | 10/10/2008 | 10/10/2008 | P | PART |
Eric Strole
|
|
|
CONTACT IS MIKE WEBB ###-#### Phone #: ###-#### Internet Inspection Request from: LENNIE BUSS-need letter from gc
|
Final | 9/26/2008 | 9/29/2008 | 9/29/2008 | A | PART |
Eric Strole
|
|
|
CONTACT IS MIKE WEBB Phone #: ###-#### Internet Inspection Request from: LENNIE BUSS-need cert papers for vac & air, need to install avb on water supply to model trimmer & letter from builder with all chairs & sinks & med gas that is going to be rough-in only at this time.
|
Water and/or Sewer | 9/2/2008 | 9/2/2008 | 9/2/2008 | P | PART |
Eric Strole
|
|
|
JOB CONTACT IS MIKE WEBB Phone #: ###-#### Internet Inspection Request from: ADAM WARR-need letter with changes made to dental office, discharge on vac system needs to be 1 1/2"-need to install rpba's on dishwashers, need norco to get certification on vac & compressed air. temp final ok.
|
Final | 8/27/2008 | 8/28/2008 | 8/28/2008 | A | FAIL |
Eric Strole
|
|
|
9:30 am-need 3rd party verification on vac & compressed air. need caps off of vents on roof. need all equipment installed & hooked up. need shutoff valve for dbca for fire system. caulk all fixtures. need letter for all unfinished work. discharge for vacuum pump needs to be inderict to floor sink.
|
Other | 8/27/2008 | 8/28/2008 | 8/28/2008 | A | PASS |
Bill VanDegrift
|
|
|
9:30 am please conference with eric ok
|
Final | 8/26/2008 | 8/27/2008 | 8/27/2008 | P | CANC |
Eric Strole
|
|
|
PLEASE USE MIKE W. AS CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY
|
Plumbing Rough-in | 6/24/2008 | 6/24/2008 | 6/24/2008 | P | PASS |
Eric Strole
|
|
|
final on 5-44-08 was a rough-in inspection, rough-in pass.
|
Final | 5/22/2008 | 5/22/2008 | 5/22/2008 | P | PASS |
Eric Strole
|
|
|
JOB CONTACT IS MIKE WEBB Phone #: ###-#### Internet Inspection Request from: ADAM WARR
|
Plumbing Rough-in | 5/22/2008 | 5/22/2008 | 5/22/2008 | P | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 5/20/2008 | 5/21/2008 | 5/21/2008 | P | NR |
Eric Strole
|
|
|
|
Plumbing Rough-in | 5/19/2008 | 5/20/2008 | 5/20/2008 | P | PART |
Eric Strole
|
|
|
MIKE WEBB Phone #: ###-#### -partital ok to insulate, need to tent all overhead copper med gas lines, ok to pull test.
|
Plumbing Rough-in | 5/19/2008 | 5/19/2008 | 5/19/2008 | P | CANC |
Bill VanDegrift
|
|
|
JOB CONTACT IS MIKE WEBB Phone #: ###-#### Internet Inspection Request from: ADAM WARR
|
Groundwork | 4/10/2008 | 4/11/2008 | 4/11/2008 | A | PASS |
Eric Strole
|
|
|
JOB CONTACT IS MIKE WEBB Phone #: ###-#### Internet Inspection Request from: ADAM WARR
|
Groundwork | 4/8/2008 | 4/9/2008 | 4/9/2008 | A | PART |
Eric Strole
|
|
|
PLEASE USE MIKE W. AS CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY-dwv pass, still need to run vac system. left correction notice to provide adequate drainage for rpba for premis protection & a dbca will be required on fire system.
|