Final | 9/4/2008 | 9/5/2008 | 9/5/2008 | P | PASS |
Eric Strole
|
|
|
late afternoon.
|
Final | 9/3/2008 | 9/4/2008 | 9/4/2008 | A | PART |
Eric Strole
|
|
|
backflow devices need tested & certified.
|
Final | 9/2/2008 | 9/3/2008 | 9/3/2008 | A | CANC |
Eric Strole
|
|
|
premis protection.
|
Final | 8/29/2008 | 8/29/2008 | 8/29/2008 | P | PART |
Eric Strole
|
|
|
still need premis protection.
|
Plumbing Rough-in | 8/22/2008 | 8/22/2008 | 8/22/2008 | P | PART |
Eric Strole
|
|
|
SWIFT WELLS ROUGH IN ON SITE CONTACT GAYLEEN ###-#### TO SCHEDULE Phone #: ###-#### Internet Inspection Request from: Allison Briggs-need dbca for premis protection, need rpba to cl2-a & hvb on boiler bib. temp final ok.
|
Plumbing Rough-in | 6/18/2008 | 6/18/2008 | 6/18/2008 | P | PASS |
Eric Strole
|
|
|
this was for ground work.
|
Plumbing Rough-in | 6/18/2008 | 6/19/2008 | 6/18/2008 | A | CANC |
Eric Strole
|
|
|
ROUGH IN PLUMBING UNDERGROUND Phone #: ###-#### Internet Inspection Request from: Allison Briggs
|