Final | 5/16/2008 | 5/16/2008 | 5/16/2008 | P | PASS |
Bill VanDegrift
|
|
|
final ok no card on site.
|
Final | 5/15/2008 | 5/16/2008 | 5/16/2008 | A | NH |
Bill VanDegrift
|
|
|
JOB CONTACT IS JEFF SECHRIST ###-#### Phone #: ###-#### Internet Inspection Request from: MARGGIE BUSS no access I'll come back this afternoon
|
Plumbing Rough-in | 5/12/2008 | 5/12/2008 | 5/12/2008 | A | PASS |
Bill VanDegrift
|
|
|
ri complete
|
Plumbing Rough-in | 5/5/2008 | 5/5/2008 | 5/5/2008 | A | PART |
Bill VanDegrift
|
|
|
basenment rest room ok to cover, drinking fountain not ready.
|
Plumbing Rough-in | 5/2/2008 | 5/2/2008 | 5/2/2008 | P | PART |
Bill VanDegrift
|
|
|
PLEASE USE JEFF S AS CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY ok'd for inspection by tim woodard on demo permit. ok to cover the main floor restroom. drinking fountain isn't ready and the basement urinal water connection needs to have the dielectric removed and brass fitting used in its place or use galvanized piping. no approved plans because permit hasn't been issued.
|