PLM-Aging Inspection | 1/10/2013 | 1/10/2013 | 1/10/2013 | | PASS |
Eric Strole
|
|
|
|
DOC - Permit Finaled | 1/10/2013 | 1/10/2013 | 1/10/2013 | P | PASS |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 10/11/2012 | 10/11/2012 | 10/11/2012 | | PART |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 7/12/2012 | 7/12/2012 | 7/16/2012 | | PART |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 4/12/2012 | 4/12/2012 | 4/12/2012 | | PART |
Eric Strole
|
|
|
|
Final | 1/12/2012 | 1/12/2012 | 1/12/2012 | P | PART |
Eric Strole
|
|
|
this is for the POOL EQUIPMENT ROOM. if questions call Steve @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann-rpba for pool fill pass.
|
Final | 10/18/2011 | 10/18/2011 | 10/18/2011 | P | PART |
Daryl Spivey
|
|
|
Ready for inspection now. If ?''s, please call Steve Asche ####-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann temp. occ. ok for 2 and 3...............ds
|
Final | 10/10/2011 | 10/11/2011 | 10/11/2011 | A | PART |
Eric Strole
|
|
|
if questions call Steve @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann-rooms 3-101,102,103 pass. guest room 3 pass. guest room 2 has no hot water. kitchen area pass. womens public rest room pass. mens public rest room no hot water.need to caulk drinking fountain.
|
Other | 7/28/2011 | 7/29/2011 | 7/29/2011 | A | PART |
Bill VanDegrift
|
|
|
TEMP FINAL for 3 models, Call Steve for the exact units ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann trim except hot water in bld 3 units DE, DW,D1
|
Plumbing Rough-in | 6/2/2011 | 6/2/2011 | 6/2/2011 | P | PART |
Eric Strole
|
|
|
Water only Bldg 2 & 3 & parking garage through 4th fl---Steve Phone #: ###-####-domestic water lines in hallways test pass
|
Plumbing Rough-in | 4/28/2011 | 4/29/2011 | 4/29/2011 | A | PART |
Bill VanDegrift
|
|
|
Rough in 4th Floor Unit F. Please call Steve if questions ###-#### >> Inspection requested via web by Stacia Haumann misc. waste testing ok
|
PLM-Aging Inspection | 4/26/2011 | 4/26/2011 | 4/27/2011 | | PART |
Bill VanDegrift
|
|
|
restarted project, 1st inspection for 2 units 1st and 2nd floors north east corned (remodled)
|
PLM-Aging Inspection | 11/8/2010 | 11/8/2010 | 11/8/2010 | | FAIL |
Bill VanDegrift
|
|
|
no activity
|
DOC - Permit Expired | 11/8/2010 | 11/8/2010 | 11/8/2010 | P | PASS |
Bill VanDegrift
|
|
|
no activity
|
PLM-Aging Inspection | 9/8/2010 | 9/8/2010 | 9/9/2010 | | PASS |
Bill VanDegrift
|
|
|
no word
|
PLM-Aging Inspection | 7/7/2010 | 7/7/2010 | 7/7/2010 | | PASS |
Bill VanDegrift
|
|
|
|
PLM-Aging Inspection | 5/5/2010 | 5/5/2010 | 5/5/2010 | | PASS |
Bill VanDegrift
|
|
|
building permit activity reflects continued construction.
|
PLM-Aging Inspection | 3/1/2010 | 3/1/2010 | 3/1/2010 | | PASS |
Bill VanDegrift
|
|
|
|
PLM-Aging Inspection | 12/28/2009 | 12/28/2009 | 12/30/2009 | | PASS |
Bill VanDegrift
|
|
|
|
PLM-Aging Inspection | 10/27/2009 | 10/27/2009 | 10/27/2009 | | PASS |
Bill VanDegrift
|
|
|
no calls
|
PLM-Aging Inspection | 8/24/2009 | 8/24/2009 | 8/24/2009 | | PASS |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 6/22/2009 | 6/22/2009 | 6/22/2009 | | PASS |
Bill VanDegrift
|
|
|
|
PLM-Aging Inspection | 4/21/2009 | 4/21/2009 | 4/24/2009 | | PASS |
Bill VanDegrift
|
|
|
no calls
|
PLM-Aging Inspection | 2/17/2009 | 2/17/2009 | 2/17/2009 | | PASS |
Bill VanDegrift
|
|
|
|
PLM-Aging Inspection | 12/17/2008 | 12/17/2008 | 12/17/2008 | | PASS |
Bill VanDegrift
|
|
|
no calls
|
Water and/or Sewer | 10/16/2008 | 10/17/2008 | 10/17/2008 | A | PART |
Daryl Spivey
|
|
|
Mains for Building 3. 2nd, 3rd and 4th floors. Call Steve ###-#### if questions. Phone #: ###-#### x0000 Internet Inspection Request from: Sonja Hankel still have tie ins to do............ds
|
Groundwork | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | CANC |
Daryl Spivey
|
|
|
This is for building #3 1st floor womens public restroom. Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | PART |
Daryl Spivey
|
|
|
This is for building #3 1st floor womens public restroom. Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel womens restrm ok.......ds
|
Plumbing Rough-in | 9/11/2008 | 9/11/2008 | 9/11/2008 | P | PART |
Daryl Spivey
|
|
|
This is for building 3 level 2. Please call Steve with questions ###-####. Have a great day Phone #: ###-#### Internet Inspection Request from: Sonja Hankel 2nd floor blding 3 water tested ok..........ds
|
Water and/or Sewer | 9/10/2008 | 9/10/2008 | 9/10/2008 | P | CANC |
Daryl Spivey
|
|
|
This is ready now....building 3 level 4 please call Steve with questions ###-####. Thanks Bill have a great day! Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 9/10/2008 | 9/10/2008 | 9/10/2008 | P | PART |
Daryl Spivey
|
|
|
This is ready now....building 3 level 4 please call Steve with questions ###-####. Thanks Bill have a great day! Phone #: ###-#### Internet Inspection Request from: Sonja Hankel 3rd and 4th floor blding 3 tested ok.......ds
|
Water and/or Sewer | 9/4/2008 | 9/4/2008 | 9/4/2008 | P | PART |
Bill VanDegrift
|
|
|
This will be for 4th floor C2 Unit. Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 9/3/2008 | 9/3/2008 | 9/3/2008 | P | PART |
Daryl Spivey
|
|
|
This is ready late afternoon, please call Steve before you head over there ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel waste and vent blding 3 3rd and 4th floor tested ok ..............ds
|
Plumbing Rough-in | 8/27/2008 | 8/27/2008 | 8/27/2008 | P | NR |
Bill VanDegrift
|
|
|
water mains 3rd and 4th floors needs insulation clearances
|
Water and/or Sewer | 8/21/2008 | 8/21/2008 | 8/21/2008 | P | CANC |
Daryl Spivey
|
|
|
Water inspection Buildings 2 and 3, 4th floor. Call Steve if questions ###-####. Thank you. Phone #: ###-#### x0000 Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 8/21/2008 | 8/21/2008 | 8/21/2008 | P | PART |
Daryl Spivey
|
|
|
Water inspection Buildings 2 and 3, 4th floor. Call Steve if questions ###-####. Thank you. Phone #: ###-#### x0000 Internet Inspection Request from: Sonja Hankel mains to room maniblocks needs tented in cold space.............ds
|
Water and/or Sewer | 8/15/2008 | 8/18/2008 | 8/18/2008 | A | PART |
Daryl Spivey
|
|
|
This will be between building #1 & 2. Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel hot water line underground between bld 1 and 2 tested ok............ds
|
Roof Drains | 8/13/2008 | 8/13/2008 | 8/13/2008 | P | PASS |
Daryl Spivey
|
|
|
Building #2 Level 3 & 4 Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 7/28/2008 | 7/28/2008 | 7/28/2008 | P | PART |
Bill VanDegrift
|
|
|
This is for building 2 & 3, guest suites. Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Water and/or Sewer | 7/22/2008 | 7/22/2008 | 7/22/2008 | P | PART |
Bill VanDegrift
|
|
|
1st Floor water. If questons call Steve A. @ ###-####8. Phone #: ###-#### x0000 Internet Inspection Request from: Sonja Hankel front units
|
Roof Drains | 7/21/2008 | 7/22/2008 | 7/21/2008 | A | PART |
Bill VanDegrift
|
|
|
This is for building #2 & 3. Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja deck drains and 2 roof drains both buildings north side tests ok.
|
Roof Drains | 7/2/2008 | 7/3/2008 | 7/3/2008 | P | PART |
Bill VanDegrift
|
|
|
This is for building #3, please call Tim with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 7/2/2008 | 7/3/2008 | 7/3/2008 | P | PART |
Bill VanDegrift
|
|
|
This is for building #3, please call Tim with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 7/1/2008 | 7/2/2008 | 7/2/2008 | A | PART |
Bill VanDegrift
|
|
|
This is for building #2 3rd and 4th floor. Please call Tim with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Roof Drains | 7/1/2008 | 7/2/2008 | 7/2/2008 | A | PART |
Bill VanDegrift
|
|
|
This is for building #2 3rd and 4th floor. Please call Tim with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Roof Drains | 6/30/2008 | 7/1/2008 | 6/30/2008 | A | PART |
Bill VanDegrift
|
|
|
Please call Tim with any questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 6/30/2008 | 7/1/2008 | 6/30/2008 | A | PART |
Bill VanDegrift
|
|
|
Please call Tim with any questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Roof Drains | 6/25/2008 | 6/25/2008 | 6/25/2008 | A | PART |
Bill VanDegrift
|
|
|
bldg 2 up to the second floor
|
Roof Drains | 6/24/2008 | 6/25/2008 | 6/25/2008 | A | PART |
Bill VanDegrift
|
|
|
This is for building #3 please call Tim with any questions ###-####. Phone #: ###-#### Internet Inspection Request from: Sonja Hankel up to the second floor
|
Roof Drains | 6/23/2008 | 6/24/2008 | 6/23/2008 | A | PART |
Bill VanDegrift
|
|
|
This will be a partial for building #2 & #3. Please call Tim with any questions ###-####. Phone #: ###-#### Internet Inspection Request from: Sonja Hankel small section of rain drain 1st and 2nd floor section between bldgs 2 and 3..
|
Roof Drains | 6/19/2008 | 6/19/2008 | 6/19/2008 | P | PART |
Bill VanDegrift
|
|
|
west side thru 2nd floor ok mostly
|
Plumbing Rough-in | 6/11/2008 | 6/12/2008 | 6/12/2008 | A | PART |
Bill VanDegrift
|
|
|
This is for waste and vent in building #2 1st and 2nd floor. Please call Tim with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Water and/or Sewer | 5/9/2008 | 5/9/2008 | 5/9/2008 | P | PART |
Bill VanDegrift
|
|
|
Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel basement resizing ok.
|
Other | 5/8/2008 | 5/8/2008 | 5/8/2008 | A | PASS |
Bill VanDegrift
|
|
|
conference on waste sizing and manabloc system sizing ok
|
Plumbing Rough-in | 5/7/2008 | 5/7/2008 | 5/7/2008 | P | PART |
Bill VanDegrift
|
|
|
This is for Grid 4-15 & M-U levels P1 & P-2. Units 1st Floor B-1/D-1 Units 2nd floor D-1/B-2/C-2 & A-2. Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel partial ri has some backgraded sections some under sized waste and misc.
|
Other | 5/5/2008 | 5/5/2008 | 5/5/2008 | A | PART |
Bill VanDegrift
|
|
|
called steve and told him to provide me with the sizing information for the water system from the manifold through the tenant spaces.
|
Plumbing Rough-in | 5/2/2008 | 5/2/2008 | 5/2/2008 | P | PART |
Bill VanDegrift
|
|
|
This is for waste in building #3 1st & 2nd floor - units D-1, B-1 & B-2. Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel TEST OK needs nail plates, s.s. 90's on on waste. 1st and 2nd floors.
|
Groundwork | 5/2/2008 | 5/2/2008 | 5/2/2008 | P | CANC |
Bill VanDegrift
|
|
|
This will be for waste in building #3, please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel Inspection cancelled from web by: Sonja Hankel
|