Final | 12/15/2008 | 12/15/2008 | 12/15/2008 | P | PASS |
Eric Strole
|
|
|
|
Final | 11/25/2008 | 11/25/2008 | 11/25/2008 | A | PART |
Eric Strole
|
|
|
Eric, looking for a partial inspection still have a drinking fountain to install. the kitchen is ready, and the rps. thanks questions call brandon thanks. Phone #: ###-#### Internet Inspection Request from: Brandon Rohricht-all corrections complete, need to install drinking fountain, temp final ok.
|
PLM-Aging Inspection | 11/24/2008 | 11/24/2008 | 11/24/2008 | | PASS |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 9/24/2008 | 9/24/2008 | 9/30/2008 | | PASS |
Eric Strole
|
|
|
wip
|
PLM-Aging Inspection | 7/24/2008 | 7/24/2008 | 7/25/2008 | | PASS |
Eric Strole
|
|
|
|
Other | 5/22/2008 | 5/23/2008 | 5/23/2008 | A | DONE |
Eric Strole
|
|
|
10:00 am walkthru with bill thompson, need to delete garbage disposal, need to have rpba for premis tested & certified, need a dbca on ice machine, rpba on dishwasher, coffee maker & soap dispenser in laundry room, detete or change out or add rpba on soap dispenser in mopsink room & put on seperate waterline other then mop sink fct, add thermal exspantion for building, have pvb on lawn sprinklers tested & certified.
|
Final | 5/22/2008 | 5/22/2008 | 5/22/2008 | P | CANC |
Eric Strole
|
|
|
brandon Phone #: ###-#### Internet Inspection Request from: Brandon Rohricht-no inspection till building permit is issued.
|
Plumbing Rough-in | 5/20/2008 | 5/20/2008 | 5/20/2008 | A | PASS |
Bill VanDegrift
|
|
|
in the kitchen where the dish washer goes, The line for the water is in the wall and tested for the hood roof top unit. thanks. Phone #: ###-#### Internet Inspection Request from: Brandon Rohricht
|