Water Heater Final | 6/10/2008 | 6/11/2008 | 6/11/2008 | A | PART |
Jim Johnson
|
|
|
talked with RP on tracking told me he had contractor responsible contractor sweep street
|
Water Heater Final | 6/3/2008 | 6/5/2008 | 6/5/2008 | A | FAIL |
Eric Strole
|
|
|
please call aaron on way out he will meet you, cell # ###-####.thanks! Phone #: ###-#### Internet Inspection Request from: Kelea Dunne-cannot use flex connector on t&p
|