Final | 8/1/2008 | 8/1/2008 | 8/1/2008 | P | PASS |
Jim Johnson
|
|
|
|
Final | 7/29/2008 | 7/30/2008 | 7/30/2008 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/29/2008 at 6:31:49 PM. Contact: ###-####. need to have sprinkler tie -in and back flow device permitted and inspected prior to plumbing final on building
|
Plumbing Rough-in | 6/25/2008 | 6/26/2008 | 6/26/2008 | A | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 6/25/2008 at 2:09:57 PM. Contact: ###-####.
|