Sprinkler (Final) | 7/18/2008 | 7/21/2008 | 7/21/2008 | A | PASS |
Eric Strole
|
|
|
jane Phone #: ###-####
|
Sprinkler (Final) | 7/11/2008 | 7/11/2008 | 7/14/2008 | P | FAIL |
Eric Strole
|
|
|
no changes made
|
Sprinkler (Final) | 7/11/2008 | 7/11/2008 | 7/11/2008 | A | FAIL |
Eric Strole
|
|
|
need 6" of clear space under dbca & retest dbca.
|
Sprinkler (Final) | 7/9/2008 | 7/10/2008 | 7/10/2008 | A | FAIL |
Eric Strole
|
|
|
mike Phone #: ###-####-cannot have blowout tee upstream of dbca, needs to be dowmstream of dbca.
|
Sprinkler (Final) | 7/3/2008 | 7/3/2008 | 7/3/2008 | P | PART |
Eric Strole
|
|
|
Jane Phone #: ###-####-need to grade line from pvb back to drain down valve.
|
Sprinkler (Final) | 6/26/2008 | 6/27/2008 | 6/27/2008 | P | NR |
Eric Strole
|
|
|
mike - ###-#### Phone #: ###-####
|