Final | 11/24/2008 | 11/25/2008 | 11/26/2008 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: raul castanon
|
Final | 11/21/2008 | 11/24/2008 | 11/24/2008 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: raul castanon Inspection cancelled from web by: raul castanon
|
Other | 11/18/2008 | 11/19/2008 | 11/19/2008 | P | DONE |
Eric Strole
|
|
|
Set with Eric for 1PM. Phone #: ###-#### Internet Inspection Request from: raul castanon-this was a conferance on backflow devices.
|
Final | 11/3/2008 | 11/4/2008 | 11/4/2008 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: raul castanon-need a rpba on chemicl dispensor in produce prep area & meat department. need a rpba on sterilox in produce prep area. need a dbca on ice machine in fish market. need airgap on drain for r.o. in pharmacy & install dbca.
|
Groundwork | 9/11/2008 | 9/11/2008 | 9/11/2008 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: raul castanon-ground work in backery pass.
|
Groundwork | 9/5/2008 | 9/5/2008 | 9/5/2008 | P | PART |
Jim Johnson
|
|
|
Partial Phone #: ###-#### Internet Inspection Request from: raul castanon-1st 13' of building drain into bakery pass.
|
Final | 8/27/2008 | 8/28/2008 | 8/28/2008 | P | FAIL |
Eric Strole
|
|
|
starbucks needs to isolate esspresso machine with a rpba, coffee machine needs a dbca, glass filler needs a seperate hot waterline isolated with a rpba or delete glass cleaner.
|
Groundwork | 8/27/2008 | 8/28/2008 | 8/28/2008 | P | PART |
Eric Strole
|
|
|
ground work for hand sink in bakery pass.
|
Final | 8/27/2008 | 8/28/2008 | 8/27/2008 | A | CANC |
Eric Strole
|
|
|
carlos--fn on coffee shop only Phone #: ###-####
|
Plumbing Rough-in | 8/27/2008 | 8/28/2008 | 8/27/2008 | A | CANC |
Eric Strole
|
|
|
carlos-- Phone #: ###-####
|
Groundwork | 8/27/2008 | 8/27/2008 | 8/27/2008 | P | PART |
Eric Strole
|
|
|
Partial U.G. Phone #: ###-#### Internet Inspection Request from: raul castanon- partial ground work in produce section pass, need traps, hub drains and extention of vent.
|
Groundwork | 8/20/2008 | 8/20/2008 | 8/20/2008 | P | PART |
Jim Johnson
|
|
|
Partial Phone #: ###-#### Internet Inspection Request from: raul castanon trap and hub drain,s and vent installed
|
Groundwork | 8/6/2008 | 8/7/2008 | 8/7/2008 | A | PART |
Eric Strole
|
|
|
Partial Groundwork inspection. Phone #: ###-#### Internet Inspection Request from: raul castanon-ground work north side for flr sinks & hub drains pass.
|
Plumbing Rough-in | 7/28/2008 | 7/29/2008 | 7/29/2008 | A | PART |
Eric Strole
|
|
|
test on waterlines pass, will check tie-in of waterlines on final.
|
Plumbing Rough-in | 7/28/2008 | 7/28/2008 | 7/28/2008 | P | PART |
Eric Strole
|
|
|
test on dwv pass, need to test water.
|
Plumbing Rough-in | 7/25/2008 | 7/25/2008 | 7/25/2008 | P | DONE |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: raul castanon-this was a conferance
|
Groundwork | 7/18/2008 | 7/18/2008 | 7/18/2008 | P | PART |
Eric Strole
|
|
|
Partial UG Phone #: ###-#### Internet Inspection Request from: raul castanon-trunk line for coolers only, still need partial vent run, need traps & hub drains installed & test when complete.
|
Groundwork | 7/16/2008 | 7/16/2008 | 7/16/2008 | P | PART |
Eric Strole
|
|
|
Partial groundwork inspection requested. Phone #: ###-#### Internet Inspection Request from: raul castanon-ground work for beer cooler pass, still need trench drain installed.
|
Groundwork | 7/14/2008 | 7/15/2008 | 7/15/2008 | A | PART |
Eric Strole
|
|
|
Partial inspection Phone #: ###-#### Internet Inspection Request from: raul castanon-ground work for coffee shop pass.
|