Final | 12/4/2008 | 12/4/2008 | 12/4/2008 | P | PASS |
Jim Johnson
|
|
|
brandon Phone #: ###-####
|
Final | 12/3/2008 | 12/3/2008 | 12/3/2008 | A | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/3/2008 at 7:02:50 AM. Contact: ###-####. upc 414.1 need hot water limitation to public lav,s T&Pcan not be piped to water heater pan upc 508.5 need R.P. installed on soda tower in an approved location with adequate drainage need D.C. installed on ice machine in an approved location left correction notice on site
|
Plumbing Rough-in | 10/10/2008 | 10/10/2008 | 10/10/2008 | A | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 10/10/2008 at 7:29:02 AM. Contact: ###-####.
|
Plumbing Rough-in | 9/24/2008 | 9/25/2008 | 9/25/2008 | P | PASS |
Jim Johnson
|
|
|
rough-in for office area only test ok ok to cover still need to finish vent,s and test in warehouse area
|
Plumbing Rough-in | 9/24/2008 | 9/24/2008 | 9/24/2008 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/24/2008 at 7:04:32 AM. Contact: ###-####. D W V test ok need to finish water need some additional hanger,s on D W V need some additional nail plates
|
Plumbing Rough-in | 8/4/2008 | 8/4/2008 | 8/4/2008 | A | PASS |
Jim Johnson
|
|
|
brandon Phone #: ###-#### inspection on ground work
|
Plumbing Rough-in | 7/30/2008 | 7/31/2008 | 7/31/2008 | A | PART |
Jim Johnson
|
|
|
brandon Phone #: ###-#### interceptor test ok ok to cover still need to vent trench drain
|
Groundwork | 7/28/2008 | 7/29/2008 | 7/29/2008 | A | PASS |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 7/25/2008 | 7/28/2008 | 7/28/2008 | P | NR |
Jim Johnson
|
|
|
Brandon Phone #: ###-#### not ready
|