PLM-Aging Inspection | 12/30/2008 | 12/30/2008 | 12/31/2008 | | PASS |
Bill VanDegrift
|
|
|
|
Final | 12/31/2008 | 12/31/2008 | 12/31/2008 | P | PASS |
Bill VanDegrift
|
|
|
final ok
|
Final | 10/28/2008 | 10/28/2008 | 10/28/2008 | P | NR |
Bill VanDegrift
|
|
|
BOTH PLACES AT 796 DIAMOND ARE READY. Phone #: ###-#### Internet Inspection Request from: Bonnie Gilbert move hose bib by r.p. in cleaning/testing area downstream of the r.p. remove existing r.p. above restrooms in testing area and abandon downstream piping.
|
Plumbing Rough-in | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | CANC |
Daryl Spivey
|
|
|
under slab inspection Phone #: ###-#### Internet Inspection Request from: Bonnie Gilbert this was a ground work.
|
Groundwork | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | PASS |
Bill VanDegrift
|
|
|
under slab inspection Phone #: ###-#### Internet Inspection Request from: Bonnie Gilbert gw for the emergency shower west side of the project ok to cover.
|
Plumbing Rough-in | 8/8/2008 | 8/8/2008 | 8/8/2008 | P | PART |
Bill VanDegrift
|
|
|
Bill V. talked to Daniel :) Phone #: ###-#### Internet Inspection Request from: Bonnie Gilbert ground work for the emergency shower, west side, ok to cover.
|
Water and/or Sewer | 8/1/2008 | 8/1/2008 | 8/1/2008 | P | PART |
Daryl Spivey
|
|
|
water line so we can cover Phone #: ###-#### Internet Inspection Request from: Bonnie Gilbert water service ok to cover, went over dcva on service and interior cross connection protection.
|