Final | 9/22/2008 | 9/22/2008 | 9/22/2008 | P | PASS |
Eric Strole
|
|
|
JOB CONTACT IS MIKE WEBB Phone #: ###-#### Internet Inspection Request from: ADAM WARR
|
Final | 9/18/2008 | 9/18/2008 | 9/18/2008 | P | PART |
Eric Strole
|
|
|
CONTACT IS CHRIS BUSS Phone #: ###-#### Internet Inspection Request from: LENNIE BUSS-relocate rpba for premis protection to a place with drainage or replace with a dbca. install main shut off valve on building supply, need tempered water of 120 degree or less to public lavs.
|
Plumbing Rough-in | 7/31/2008 | 7/31/2008 | 7/31/2008 | P | PASS |
Bill VanDegrift
|
|
|
JOB CONTACT IS CHRIS BUSS Phone #: ###-#### Internet Inspection Request from: ADAM WARR left chris a message about changing out the rp in the crawlspace by the access with a dcva. ri ok
|
Plumbing Rough-in | 7/31/2008 | 8/1/2008 | 7/31/2008 | A | CANC |
Eric Strole
|
|
|
JOB CONTACT IS CHRIS BUSS Phone #: ###-#### Internet Inspection Request from: ADAM WARR Inspection cancelled from web by: ADAM WARR
|
Plumbing Rough-in | 7/30/2008 | 7/31/2008 | 7/31/2008 | P | CANC |
Eric Strole
|
|
|
CONTACT IS CHRIS BUSS Phone #: ###-#### Internet Inspection Request from: LENNIE BUSS Inspection cancelled from web by: ADAM WARR
|