Final | 9/18/2008 | 9/18/2008 | 9/18/2008 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dave Tewalt
|
Final | 9/16/2008 | 9/17/2008 | 9/17/2008 | P | PART |
Eric Strole
|
|
|
RP and tempering valve''s are in place Phone #: ###-#### Internet Inspection Request from: Dave Tewalt-need drainage for rpba & unions.
|
Final | 9/9/2008 | 9/9/2008 | 9/9/2008 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dave Tewalt-need tempered water of 120 degree or less to hand sink & public lav. need to install rpba on dishwasher. dishwasher requires a 1/2" ID water supply. fix tailpiece on prep sink. temp final ok.
|
Plumbing Rough-in | 8/15/2008 | 8/18/2008 | 8/18/2008 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dave Tewalt
|
Plumbing Rough-in | 8/15/2008 | 8/15/2008 | 8/15/2008 | P | PASS |
Eric Strole
|
|
|
|
Groundwork | 8/8/2008 | 8/11/2008 | 8/11/2008 | A | PASS |
Eric Strole
|
|
|
GROUND WORK INSP. Phone #: ###-#### Internet Inspection Request from: Dave Tewalt
|
Groundwork | 8/8/2008 | 8/11/2008 | 8/10/2008 | A | CANC |
Eric Strole
|
|
|
|
Groundwork | 8/8/2008 | 8/8/2008 | 8/8/2008 | P | FAIL |
Eric Strole
|
|
|
need to change out san tees on there back to approved fittings, min 2" dwv below slab.
|