Final | 4/16/2009 | 4/16/2009 | 4/16/2009 | P | PASS |
Jim Johnson
|
|
|
This is ready now. please call Blair with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Final | 4/15/2009 | 4/15/2009 | 4/16/2009 | P | PASS |
Jim Johnson
|
|
|
Please call Blair with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Final | 4/16/2009 | 4/16/2009 | 4/16/2009 | P | CANC |
Jim Johnson
|
|
|
Please call Bliar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel Inspection cancelled from web by: Sonja Hankel
|
Final | 4/7/2009 | 4/8/2009 | 4/8/2009 | A | PART |
Jim Johnson
|
|
|
need to provide identification on D W V reclaimed water system. provide nonpotable water signage on nonpotable water line up to mechanical room on roof. provide hose bib vaccum breakers on hose connection outlet,s. cap all stack vent,s and vent stack,s outlet,s with an approved cap ( no duct tape ). cut outside cleanout,s to grade and cap. finish piping T&P on water heater drain,s contractor to recall when ready.
|
Final | 4/7/2009 | 4/7/2009 | 4/7/2009 | P | CANC |
Jim Johnson
|
|
|
Please call Blair with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
PLM-Aging Inspection | 3/16/2009 | 3/16/2009 | 3/16/2009 | | PASS |
Jim Johnson
|
|
|
|
Groundwork | 1/13/2009 | 1/14/2009 | 1/14/2009 | A | CANC |
Jim Johnson
|
|
|
Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Groundwork | 1/12/2009 | 1/13/2009 | 1/13/2009 | A | PART |
Jim Johnson
|
|
|
Please call Larry with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel floor sink,s and vent,s and roof and overflow drain,s noted on plan,s test ok
|
Plumbing Rough-in | 1/6/2009 | 1/7/2009 | 1/7/2009 | A | PART |
Jim Johnson
|
|
|
Please call Larry with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel last three waste and vent stack,s test ok
|
Plumbing Rough-in | 12/22/2008 | 12/23/2008 | 12/23/2008 | A | PART |
Jim Johnson
|
|
|
Please call Larry with any questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel ground-work on revised gray water system ok ok to cover
|
Roof Drains | 12/17/2008 | 12/17/2008 | 12/17/2008 | P | PART |
Jim Johnson
|
|
|
Please call Larry with quesetions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel roof and over flow drain, waste and vent stack,s on grid line c and E-3 test ok
|
Plumbing Rough-in | 12/15/2008 | 12/16/2008 | 12/16/2008 | P | PART |
Jim Johnson
|
|
|
Please call Larry with any questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel third floor water loop,s test ok
|
Plumbing Rough-in | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/1/2008 at 8:38:03 AM. Contact: ###-####. second floor hot and cold water main loop test ok
|
Plumbing Rough-in | 11/17/2008 | 11/18/2008 | 11/18/2008 | A | PART |
Jim Johnson
|
|
|
ground floor hot and cold water loop test ok
|
Plumbing Rough-in | 11/17/2008 | 11/17/2008 | 11/17/2008 | P | NR |
Jim Johnson
|
|
|
Please call Larry with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel not ready
|
Groundwork | 10/16/2008 | 10/17/2008 | 10/17/2008 | P | PART |
Jim Johnson
|
|
|
Please call Larry with question ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel ground work test ok gray water piping color coded purple plumbers adjusting grade as they backfill with sand
|
Water and/or Sewer | 10/16/2008 | 10/16/2008 | 10/16/2008 | P | PART |
Jim Johnson
|
|
|
Please call Larry with any questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel water line only test ok
|
Groundwork | 10/10/2008 | 10/10/2008 | 10/10/2008 | P | PART |
Eric Strole
|
|
|
test on building drain & grey water pass, risers and laterials 5' to the west. still teed to tape grey water system per appendix G 2003 upc.
|
Groundwork | 10/9/2008 | 10/9/2008 | 10/9/2008 | P | FAIL |
Eric Strole
|
|
|
need to use primer with glue for roof drains & need to use approved glue on waste & grey water.
|
Groundwork | 10/8/2008 | 10/9/2008 | 10/9/2008 | A | NR |
Eric Strole
|
|
|
Please call Russel with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Water and/or Sewer | 8/19/2008 | 8/19/2008 | 8/19/2008 | P | PART |
Jim Johnson
|
|
|
Please call Lynn with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel 20 feet of type K copper water line test ok
|