Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberPLM08-02176
StatusFinaled
Name TOTL PLUMBING
Site Address 1521 S COLORADO AVE
Project Name 
Customer Number 
ePlanReview 
Description
Plumbing Permit - New: plumb new house
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final2/4/20092/4/20092/4/2009PPASS
DetailsBill VanDegrift
The cap on upstairs trap arm is installed
Phone #: ###-#### Internet Inspection Request from: Josh Roper
Final2/3/20092/3/20092/3/2009PFAIL
DetailsBill VanDegrift
Hey Bill. Only thing not ready is the potfiller. Waiting on the tile guys to finish it. Thanks, -Josh
Phone #: ###-#### Internet Inspection Request from: Josh Roper cap waste to 1/2 bath lav or set the fixture.
Plumbing Rough-in11/6/200811/7/200811/7/2008APASS
DetailsBill VanDegrift
ri ok
Plumbing Rough-in11/6/200811/6/200811/6/2008PNR
DetailsBill VanDegrift
please come as late in the day as poosible Phone #: ###-#### Internet Inspection Request from: Josh Roper tomarrow
Water and/or Sewer9/10/20089/10/20089/10/2008APART
DetailsBill VanDegrift
Hey Bill, got that old pipe dug up and replaced to outsided the foundation and got a new building sewer c.o. cut in. Phone #: ###-#### Internet Inspection Request from: Josh Roper building drain extended outside foundation ok.
Water and/or Sewer9/9/20089/9/20089/9/2008AFAIL
DetailsBill VanDegrift
existing sewer is located in the new crawl space. I extended the sewer to the basement, left a stub up in the crawl and continued it outside the foundation to allow for building sewer cleanout. Kinda different but I didn''t see any other way to do it. Phone #: ###-#### Internet Inspection Request from: Josh Roper need to replace the existing AC sewer under the new house with approved material.