Final | 1/15/2009 | 1/15/2009 | 1/15/2009 | P | PASS |
Eric Strole
|
|
|
this permit was for rough-in only.
|
Plumbing Rough-in | 10/2/2008 | 10/2/2008 | 10/2/2008 | P | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 10/2/2008 | 10/2/2008 | 10/2/2008 | A | NR |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 10/2/2008 at 7:22:33 AM. Contact: ###-####.
|
Plumbing Rough-in | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | FAIL |
Eric Strole
|
|
|
Plumbing Rough-In. Contact = Sandy Watson Phone #: ###-#### Internet Inspection Request from: Kristy Watson-dwv test failed, support dwv every 4' -waterlines in exteriour walls require 3 1/2" for insulation.
|