DOC - Permit Finaled | 1/12/2010 | 1/12/2010 | 1/12/2010 | P | PASS |
Daryl Spivey
|
|
|
permit was taken over by adifferent plumber........plm09-01112
|
Other | 1/12/2010 | 1/12/2010 | 1/12/2010 | P | PASS |
Daryl Spivey
|
|
|
|
Other | 6/25/2009 | 6/25/2009 | 6/25/2009 | A | PART |
Daryl Spivey
|
|
|
Last inspection was a partial as valves have not been installed........Talked with Ted ( new const. foreman) and may have another plumber finish up work on installing valves, ect.................ds
|
Plumbing Rough-in | 3/18/2009 | 3/18/2009 | 3/18/2009 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-####
|
Plumbing Rough-in | 3/16/2009 | 3/17/2009 | 3/17/2009 | A | FAIL |
Eric Strole
|
|
|
need to roll horizontal vents above basement bath & move waterlines 12" from can lights.
|
Plumbing Rough-in | 3/16/2009 | 3/17/2009 | 3/17/2009 | A | PART |
Bill VanDegrift
|
|
|
met eric to go over ri requirements.
|
Plumbing Rough-in | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | PART |
Eric Strole
|
|
|
brian Phone #: ###-####
|
Plumbing Rough-in | 11/19/2008 | 11/20/2008 | 11/20/2008 | A | CANC |
Daryl Spivey
|
|
|
paul Phone #: ###-####
|
Plumbing Rough-in | 11/19/2008 | 11/19/2008 | 11/19/2008 | P | PASS |
Daryl Spivey
|
|
|
paul - around 3:30 or 4:00 if possible Phone #: ###-####
|
Plumbing Rough-in | 11/14/2008 | 11/17/2008 | 11/18/2008 | A | CANC |
Daryl Spivey
|
|
|
Christopher-ejector pump? Phone #: ###-####
|
Groundwork | 11/18/2008 | 11/18/2008 | 11/18/2008 | A | PASS |
Daryl Spivey
|
|
|
Christopher-ejector pump? Phone #: ###-#### G/W for ejector tested and passed............ds
|
Plumbing Rough-in | 11/14/2008 | 11/14/2008 | 11/14/2008 | P | NR |
Daryl Spivey
|
|
|
Chris Phone #: ###-####
|
Plumbing Rough-in | 11/13/2008 | 11/13/2008 | 11/13/2008 | P | CANC |
Daryl Spivey
|
|
|
Chris Phone #: ###-####
|
Other | 11/13/2008 | 11/13/2008 | 11/13/2008 | P | PEND |
Daryl Spivey
|
|
|
Chris Phone #: ###-#### conference....check on groundwork...............ds
|