Final | 11/24/2008 | 11/25/2008 | 11/25/2008 | A | PASS |
Eric Strole
|
|
|
This is a remodel. Use entrance on the northwest corner behind garage. Thanks. Phone #: ###-#### Internet Inspection Request from: Todd Hill
|
Plumbing Rough-in | 10/22/2008 | 10/22/2008 | 10/22/2008 | P | PASS |
Eric Strole
|
|
|
rough-in ready for inspection. Phone #: ###-#### Internet Inspection Request from: Todd Hill
|
Plumbing Rough-in | 10/13/2008 | 10/13/2008 | 10/13/2008 | A | PASS |
Eric Strole
|
|
|
This inspection is for under the floor before they lay the floor down because it is in there garage. Phone #: ###-#### Internet Inspection Request from: Todd Hill-in floor rough-in pass.
|