Final | 12/8/2008 | 12/9/2008 | 12/9/2008 | A | PASS |
Jim Johnson
|
|
|
JOB CONTACT IS MIKE OWENS Phone #: ###-#### Internet Inspection Request from: ADAM WARR
|
Final | 12/5/2008 | 12/8/2008 | 12/8/2008 | P | NR |
Jim Johnson
|
|
|
CONTACT IS CHRIS BUSS ###-#### Phone #: ###-#### Internet Inspection Request from: LENNIE BUSS not ready
|
Other | 11/4/2008 | 11/4/2008 | 11/4/2008 | P | PART |
Jim Johnson
|
|
|
as per cross control connection manual sixth edition need to have the following additional back flow devices installed and corrected prior to final plumbing inspection 1- need to install premise protection ( double check ) on main water service to building with expansion tank. 2- need to install R. P. on coffee maker in breakroom or change out to an approved coffee maker. 3- need to shorten hose to pool hand held shower so shower head does not lay on shower floor. left correction notice on site also called plumbing contractor on correction,s
|
Other | 10/31/2008 | 11/3/2008 | 11/3/2008 | P | PART |
Jim Johnson
|
|
|
need to call bill thompson for a walkthru on backflow. there is no premis protection on building. made walk through with Bill T. with united water for additional backflow protection on building need to install premise protection ( double check ) with expansion tank need an R.P. on coffee maker in breakroom need to shorthen hose on personal shower in pool area
|
Plumbing Rough-in | 11/3/2008 | 11/3/2008 | 11/3/2008 | P | CANC |
Jim Johnson
|
|
|
JOB CONTACT IS CHRIS BUSS Phone #: ###-#### Internet Inspection Request from: ADAM WARR
|
Plumbing Rough-in | 11/3/2008 | 11/3/2008 | 11/3/2008 | A | PASS |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 10/31/2008 | 10/31/2008 | 10/31/2008 | P | FAIL |
Eric Strole
|
|
|
JOB CONTACT IS CHRIS BUSS Phone #: ###-#### Internet Inspection Request from: ADAM WARR-dwv test failed, need no-hub bands on 3" tie-in basement.(not mission couplings)
|