Final | 7/13/2009 | 7/14/2009 | 7/14/2009 | A | PASS |
Jim Johnson
|
|
|
Please call Darren with any questions. Phone #: ###-#### Internet Inspection Request from: Diane Houst
|
Final | 7/10/2009 | 7/13/2009 | 7/13/2009 | A | PART |
Jim Johnson
|
|
|
Brad ###-#### need to move trap primer connection to down stream side of premise protection double check in mechanical room contractor will recall when ready oked temp.
|
Final | 7/8/2009 | 7/10/2009 | 7/10/2009 | P | CANC |
Jim Johnson
|
|
|
Please contact Brad with any questions or concerns. Phone #: ###-#### Internet Inspection Request from: Diane Houst reschedule with Brad to make walk through for final monday 7/13/ 09
|
PLM-Aging Inspection | 6/10/2009 | 6/10/2009 | 6/10/2009 | | PASS |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 4/9/2009 | 4/10/2009 | 4/10/2009 | P | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 4/9/2009 | 4/9/2009 | 4/9/2009 | P | PART |
Eric Strole
|
|
|
2nd rough for drinking fountains. Please contact Mark with any questions. Phone #: ###-#### Internet Inspection Request from: Diane Houst-need to test dwv & water.
|
Plumbing Rough-in | 3/9/2009 | 3/10/2009 | 3/10/2009 | A | PART |
Eric Strole
|
|
|
Please contact Mark with any questions. Phone #: ###-#### Internet Inspection Request from: Diane Houst-all dwv & water except drinking fountains pass, water heater & overhead water on 2" main that still needs to be tied in will be exposed & can be inspected on final.
|
Plumbing Rough-in | 3/3/2009 | 3/5/2009 | 3/5/2009 | A | PART |
Eric Strole
|
|
|
Please contact Doran with any questions. Phone #: ###-#### Internet Inspection Request from: Diane Houst-main womens & mens & bath on south east side pass.
|
Plumbing Rough-in | 2/26/2009 | 2/27/2009 | 2/27/2009 | P | FAIL |
Eric Strole
|
|
|
Please call Darren if you have any questions. Phone #: ###-#### Internet Inspection Request from: Diane Houst-Water piping for mens & womens main bath is under sized. Trap arm for wash basin in womens bath is s-traped. Test on this section of dwv pass. This is the only section that was inspected today.
|
PLM-Aging Inspection | 12/30/2008 | 12/30/2008 | 12/30/2008 | | PASS |
Eric Strole
|
|
|
|
Groundwork | 10/27/2008 | 10/28/2008 | 10/28/2008 | P | PASS |
Eric Strole
|
|
|
interceptor 24 hr test-test pass
|
Groundwork | 10/27/2008 | 10/27/2008 | 10/27/2008 | P | PART |
Eric Strole
|
|
|
Please contact Doran with any questions Phone #: ###-#### Internet Inspection Request from: Diane Houst-groundwork & waterline & sewer & interceptor piping pass. waterline is only to outside builbing & will check test on interceptor 10-28-08 pm.
|