Final | 1/22/2009 | 1/23/2009 | 1/23/2009 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/22/2009 at 8:30:54 AM. Contact: ###-####.
|
Final | 1/20/2009 | 1/21/2009 | 1/21/2009 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/20/2009 at 1:29:42 PM. Contact: ###-####. need to have existing premius protection tested and certified for final need to provide 120 degree hot water limitation to public laves as per U P C 414.1 2003 left correction notice on site contractor to recall when ready
|
Plumbing Rough-in | 12/15/2008 | 12/16/2008 | 12/16/2008 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/15/2008 at 3:22:59 PM. Contact: ###-####.
|
Plumbing Rough-in | 11/10/2008 | 11/12/2008 | 11/12/2008 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/10/2008 at 3:29:35 PM. Contact: ###-####. this inspection is for the groundwork DWV ONLY
|