Final | 4/14/2009 | 4/15/2009 | 4/15/2009 | A | PASS |
Eric Strole
|
|
|
|
Final | 4/14/2009 | 4/14/2009 | 4/14/2009 | P | CANC |
Eric Strole
|
|
|
|
Final | 4/13/2009 | 4/13/2009 | 4/13/2009 | P | PART |
Eric Strole
|
|
|
gary Phone #: ###-####-needto pipe t&p to an approved location, need hvb on boiler bib, vent needs to be 3' above or 10' away from opening window.
|
Plumbing Rough-in | 4/10/2009 | 4/10/2009 | 4/10/2009 | P | PART |
Eric Strole
|
|
|
gary Phone #: ###-####-walk thru on rough-in with gary.
|
Water and/or Sewer | 11/19/2008 | 11/19/2008 | 11/19/2008 | P | PASS |
Eric Strole
|
|
|
gary Phone #: ###-####
|
DOC - Permit Finaled | 11/19/2008 | 11/19/2008 | 11/19/2008 | P | PASS |
Eric Strole
|
|
|
gary Phone #: ###-####
|
Water and/or Sewer | 11/18/2008 | 11/18/2008 | 11/18/2008 | P | PART |
Eric Strole
|
|
|
gary Phone #: ###-####-waterline pass
|