Final | 3/9/2009 | 3/10/2009 | 3/10/2009 | A | PASS |
Bill VanDegrift
|
|
|
final ok
|
Final | 3/9/2009 | 3/9/2009 | 3/9/2009 | P | PART |
Bill VanDegrift
|
|
|
greg Phone #: ###-#### just needs rp's tested
|
Other | 3/6/2009 | 3/6/2009 | 3/6/2009 | P | PASS |
Bill VanDegrift
|
|
|
3:00 cross connection conference ok
|
Other | 3/6/2009 | 3/6/2009 | 3/6/2009 | P | DONE |
Eric Strole
|
|
|
3:00 pm conferance
|
Final | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | PART |
Eric Strole
|
|
|
need to isolate treatment room, containment room & lab with a rpba on the hot & cold. t&p on water heater needs to be turned down. need tempered water to public lavs. need thermal expantion tank. temp final ok.
|
Final | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | PART |
Bill VanDegrift
|
|
|
met bill thompson and eric went over cross connection protection
|
Final | 3/4/2009 | 3/5/2009 | 3/5/2009 | A | PEND |
Eric Strole
|
|
|
greg Phone #: ###-####-will meet with vet & bill thompson at 1:30 to see what they will be doing in each room.
|
PLM-Aging Inspection | 2/9/2009 | 2/9/2009 | 2/10/2009 | | PASS |
Bill VanDegrift
|
|
|
still working
|
Plumbing Rough-in | 12/5/2008 | 12/8/2008 | 12/8/2008 | P | PART |
Bill VanDegrift
|
|
|
Greg Phone #: ###-#### gw ok to cover
|