Final | 6/10/2009 | 6/11/2009 | 6/10/2009 | A | PASS |
Bill VanDegrift
|
|
|
Candace ###-####
|
Final | 6/8/2009 | 6/9/2009 | 6/9/2009 | P | FAIL |
Bill VanDegrift
|
|
|
candace Phone #: ###-#### - please call for access steamer needs a dcva
|
Plumbing Rough-in | 2/19/2009 | 2/20/2009 | 2/20/2009 | P | PASS |
Bill VanDegrift
|
|
|
james Phone #: ###-#### ri ok
|
Groundwork | 1/6/2009 | 1/6/2009 | 1/6/2009 | A | PASS |
Bill VanDegrift
|
|
|
|
Groundwork | 1/5/2009 | 1/5/2009 | 1/5/2009 | P | FAIL |
Bill VanDegrift
|
|
|
candane Note: after 1:00 pm Phone #: ###-#### upper floor fixtures cant go through the backwater valve.
|
Groundwork | 12/23/2008 | 12/31/2008 | 12/30/2008 | P | CANC |
Bill VanDegrift
|
|
|
colby Phone #: ###-#### Note: if possible LATE MORNING Inspection cancelled from web by: Patricia Smith
|