Final | 12/18/2009 | 12/18/2009 | 12/18/2009 | A | PASS |
Daryl Spivey
|
|
|
Rough in only.......plm09-02152 set fixtures...............ds
|
Plumbing Rough-in | 7/16/2009 | 7/17/2009 | 7/17/2009 | A | PASS |
Daryl Spivey
|
|
|
Bruce Phone #: ###-#### good to cover..............ds
|
Other | 6/24/2009 | 6/24/2009 | 6/24/2009 | A | NR |
Daryl Spivey
|
|
|
wip
|
Other | 3/5/2009 | 3/5/2009 | 3/5/2009 | A | PASS |
Daryl Spivey
|
|
|
conference
|
Plumbing Rough-in | 2/11/2009 | 2/11/2009 | 2/11/2009 | P | PART |
Daryl Spivey
|
|
|
ok to cover except valve locations.........ds
|
Plumbing Rough-in | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | PART |
Daryl Spivey
|
|
|
bruce Phone #: ###-#### need UPC appoved and listed valves.......ds
|
Other | 2/10/2009 | 2/10/2009 | 2/10/2009 | A | PASS |
Daryl Spivey
|
|
|
bruce Phone #: ###-#### conference for rough-in...........ds
|
Water and/or Sewer | 2/10/2009 | 2/10/2009 | 2/10/2009 | A | CANC |
Daryl Spivey
|
|
|
conference R/I conf.................ds
|