Final | 3/25/2009 | 3/25/2009 | 3/25/2009 | P | PASS |
Eric Strole
|
|
|
Dave ###-####
|
Water and/or Sewer | 2/27/2009 | 2/27/2009 | 2/27/2009 | P | PASS |
Eric Strole
|
|
|
|
Water and/or Sewer | 2/26/2009 | 2/26/2009 | 2/27/2009 | P | PART |
Eric Strole
|
|
|
Dave Phone #: ###-####-waterline pass, pvb needs tested & certified by final. sewer needs to be tested.
|
Plumbing Rough-in | 1/14/2009 | 1/15/2009 | 1/15/2009 | A | PASS |
Eric Strole
|
|
|
Dave Phone #: ###-####
|