Final | 9/14/2009 | 9/15/2009 | 9/15/2009 | A | PASS |
Daryl Spivey
|
|
|
Please call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Groundwork | 8/24/2009 | 8/24/2009 | 8/24/2009 | P | PART |
Daryl Spivey
|
|
|
Please call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel ejector tank and pumps in and tested with vent to be tie in after concrete is poured.........ds
|
Other | 8/18/2009 | 8/18/2009 | 8/18/2009 | A | PASS |
Daryl Spivey
|
|
|
walk thru on ejector system and final rough in..................ds
|
Roof Drains | 7/15/2009 | 7/16/2009 | 7/16/2009 | A | PASS |
Daryl Spivey
|
|
|
Please call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Groundwork | 7/8/2009 | 7/9/2009 | 7/9/2009 | A | PASS |
Daryl Spivey
|
|
|
PLease call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 6/29/2009 | 6/30/2009 | 6/30/2009 | A | PART |
Daryl Spivey
|
|
|
Please call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hanke 3" lines from SW roof drains tested.........ds
|
Plumbing Rough-in | 6/29/2009 | 6/29/2009 | 6/29/2009 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 6/29/2009 at 8:33:33 AM. Contact: ###-####. roof drains east, vent stacks, and main water lines to mech. room ok...............ds
|
Plumbing Rough-in | 6/4/2009 | 6/4/2009 | 6/4/2009 | P | PART |
Daryl Spivey
|
|
|
This is for the 2nd floor, please call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel waste and vent in basement and southend 2nd floor waste and vent and water tested ok.................ds
|
Plumbing Rough-in | 5/28/2009 | 5/29/2009 | 5/29/2009 | A | PART |
Daryl Spivey
|
|
|
This is for the north end of the basement. Please call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 5/19/2009 | 5/20/2009 | 5/20/2009 | A | PART |
Daryl Spivey
|
|
|
This will be for the south end. Please call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel water, waste and vent tested south east basement..............ds
|
Groundwork | 4/1/2009 | 4/2/2009 | 4/2/2009 | A | PART |
Daryl Spivey
|
|
|
PLease call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Groundwork | 3/18/2009 | 3/18/2009 | 3/18/2009 | P | CANC |
Daryl Spivey
|
|
|
Please call Mark with questions. Thank you Daryl, I must not have hit confrim :) Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Groundwork | 3/18/2009 | 3/18/2009 | 3/18/2009 | A | PART |
Daryl Spivey
|
|
|
Mark
|
Other | 3/12/2009 | 3/12/2009 | 3/12/2009 | A | PASS |
Daryl Spivey
|
|
|
conference
|