Final | 5/21/2009 | 5/22/2009 | 5/22/2009 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Brandon Van Wey
|
Final | 5/10/2009 | 5/11/2009 | 5/11/2009 | A | PART |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Brandon Van Wey lable all existing backflow devices additional backflow,s may be required need seperate water supply to chemical dispencer by mop sink called contractor
|
PLM-Aging Inspection | 5/4/2009 | 5/4/2009 | 5/5/2009 | | PASS |
Jim Johnson
|
|
|
|
Final | 3/1/2009 | 3/2/2009 | 3/2/2009 | A | PART |
Jim Johnson
|
|
|
Internet Inspection Request from: Brandon Van Wey need to have main water service premius protection tested and certified
|
Groundwork | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | PASS |
Jim Johnson
|
|
|
Internet Inspection Request from: Brandon Van Wey
|