Final | 5/3/2009 | 5/4/2009 | 5/4/2009 | A | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 5/3/2009 at 10:48:22 AM. Contact: ###-####.
|
Plumbing Rough-in | 2/27/2009 | 3/2/2009 | 3/2/2009 | A | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 2/27/2009 at 5:16:19 PM. Contact: ###-####.
|
Plumbing Rough-in | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | PASS |
Eric Strole
|
|
|
frank Phone #: ###-####-2nd under flr rough-in pass.
|
Plumbing Rough-in | 2/19/2009 | 2/20/2009 | 2/20/2009 | A | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 2/19/2009 at 6:35:38 PM. Contact: ###-####. this was for a under flr ground work on south side of house.
|