DOC - Permit Finaled | | | 3/30/2010 | | DONE |
|
|
|
|
Final | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-####
|
Final | 3/25/2009 | 3/26/2009 | 3/26/2009 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 3/25/2009 at 3:55:45 PM. Contact: ###-####. test premise dcva, remove trapped flew connectors on water heater t&p discharge and replace with approved material. no food prep sinks have direct wastes.
|
Plumbing Rough-in | 2/26/2009 | 2/26/2009 | 2/26/2009 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: raul castanon
|
Plumbing Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: raul castanon tests ok for restroom rough in, complete plumbing for food service area or have scope of work modified to reflect work preformed, CDHD will send Bud Fullerton out to verify requirements from their point of view. mop sink will not be relocated, existing location ok.
|
Groundwork | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | CANC |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: raul castanon Inspection cancelled from web by: raul castanon
|