Final | 5/29/2009 | 6/1/2009 | 6/1/2009 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Brent Lacy
|
Final | 5/22/2009 | 5/22/2009 | 5/22/2009 | P | PART |
Jim Johnson
|
|
|
Ready around 11:00 AM Phone #: ###-#### Internet Inspection Request from: Brent Lacy need to finish all plumbing fixture installation oked temp. contractor to recall when ready
|
Plumbing Rough-in | 4/9/2009 | 4/9/2009 | 4/9/2009 | P | PASS |
Jim Johnson
|
|
|
Water Pipe is under test and ready for inspection.
Thx, Robert Phone #: ###-#### Internet Inspection Request from: Brent Lacy
|
Roof Drains | 4/6/2009 | 4/7/2009 | 4/7/2009 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Brent Lacy
|
Roof Drains | 4/6/2009 | 4/6/2009 | 4/6/2009 | P | FAIL |
Jim Johnson
|
|
|
Rain Drains are Ready Phone #: ###-#### Internet Inspection Request from: Brent Lacy test failed on roof and overflow drain,s on east side of building called contractor will recall when ready
|
Roof Drains | 4/2/2009 | 4/2/2009 | 4/2/2009 | P | PART |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Brent Lacy roof and overflow drain,s on north side test ok
|
Plumbing Rough-in | 3/11/2009 | 3/11/2009 | 3/11/2009 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/11/2009 at 7:09:40 AM. Contact: ###-####. rough-in on in wall only test ok
|
Roof Drains | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/25/2009 at 8:23:21 AM. Contact: ###-####. piping to roof and overflow drain,s test ok need to make connection to roof and overflow drain,s and retest talked to plumber on site will recall when ready
|