Final | 6/2/2009 | 6/2/2009 | 6/2/2009 | A | PASS |
Bill VanDegrift
|
|
|
ok from legal final ok
|
Final | 5/14/2009 | 5/14/2009 | 5/14/2009 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/14/2009 at 9:48:26 AM. Contact: ###-####. still need sewer approval for service across PHI.inc property.
|
Storm Drains | 4/13/2009 | 4/14/2009 | 4/14/2009 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 4/13/2009 at 3:13:59 PM. Contact: ###-####.
|
Plumbing Rough-in | 4/10/2009 | 4/13/2009 | 4/13/2009 | A | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 4/10/2009 at 11:03:17 AM. Contact: ###-####.-dwv & water pass, roof drains need tested.need ti permit associated with ti building permit.
|
Plumbing Rough-in | 4/9/2009 | 4/10/2009 | 4/10/2009 | P | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 4/9/2009 at 1:50:21 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Apr 10 2009 11:01AM.
|
Other | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | PASS |
Bill VanDegrift
|
|
|
talked to plumber about the south unit sinks going to grease line.
|
Groundwork | 3/13/2009 | 3/16/2009 | 3/16/2009 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 3/13/2009 at 3:50:47 PM. Contact: ###-####. shell gw only ok the book store gw was in minus the floor sink but that permit hasn't been submitted for review yet.
|