Final | 7/30/2010 | 7/30/2010 | 7/30/2010 | P | PASS |
Daryl Spivey
|
|
|
phillip Phone #: ###-####
|
PLM-Aging Inspection | 5/25/2010 | 5/25/2010 | 5/25/2010 | | PASS |
Jim Johnson
|
|
|
building permit extended of 180 day,s on 3/26/10
|
PLM-Aging Inspection | 3/24/2010 | 3/24/2010 | 3/24/2010 | | PASS |
Jim Johnson
|
|
|
|
Other | 9/30/2009 | 10/1/2009 | 10/1/2009 | A | PART |
Jim Johnson
|
|
|
Bob Phone #: ###-#### plumbing conf. only
|
Plumbing Rough-in | 4/3/2009 | 4/6/2009 | 4/6/2009 | A | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 4/2/2009 | 4/3/2009 | 4/3/2009 | P | NR |
Eric Strole
|
|
|
|
Plumbing Rough-in | 4/1/2009 | 4/2/2009 | 4/2/2009 | A | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 4/1/2009 at 2:56:52 PM. Contact: ###-####.need duel drain on washer for softner drain, dwv & water test pass.
|